02 cables and leads identifi cation, Pak 200 installation, 02 cables and leads identifi cation – Tweco Pak 200 User Manual
Page 28: Figure 3-1: cables identifi cation, Figure 3-2: leads identifi cation
INSTALLATION 3-2
Manual
0-5057
PAK 200
INSTALLATION
3.02 Cables and Leads Identifi cation
Refer to “Connect Input Power and System Ground Cables” on page 3-6 for ground connections and ground cables.
Primary power
Control
Cable
Ground
Cable
Work
Art # A-08376_AB
Torch
Work Cable
PAK 200
Power Supply
Arc Starter /
Gas Control Module
(GCM-200)
Pilot Return
Negative
Coolant Supply
Coolant Return
Control Cable
Torch Lead Set
- Coolant Supply w/ Negative
- Coolant Return
- Pilot Return
- Plasma Gas
- Shield Gas
- Control Cable
Maximum Length 100’ / 30.5 m
Primary Ground
Figure 3-1: Cables Identifi cation
G
Torch Lead Set
Art # A-08377_AC
Green / Yellow #4 AWG
A
Green
Red
#8 AWG Cable
#1 AWG Cable
B
C
D
E
F
K
Work Cable
37
14
Coolant Leads, Power Supply
to Arc Starter
Pilot Return, Power Supply
to Arc Starter
Negative Lead, Power Supply
to Arc Starter
Control Cable, Power Supply
to Arc Starter
Ground Cable
O
Control Cable,
Power Supply to
Gas Control Module
Green
Red
4’ / 1.3 m
#1 AWG
Figure 3-2: Leads Identifi cation