Motor and cowling installation – E-flite DHC-2 Beaver 25e ARF User Manual
Page 10

10
E-flite DHC-2 Beaver ARF Assembly Manual
3. Secure the right half of the landing gear
using two 6-32 x 3/8-inch socket head screws and
two #6 washers.
Motor and Cowling Installation
Required Parts
Fuselage
Motor w/mount and accessories
#4 washer (8)
Cowling
Hook and loop tape (2)
Motor battery
Electronic speed control
Propeller
Velcro straps
9-inch servo extension
Spinner w/backplate and screws
4-40 x 3/8-inch socket head screw (4)
Power 32 specific:
4-40 x 1-inch socket head screw (4)
Aluminum motor spacer (4)
Power 25 specific:
4-40 x 1/2-inch socket head screw (4)
Required Tools and Adhesives
Ball driver: 3/32-inch
Threadlock
Phillips screwdriver: #1, #2
6-minute epoxy
Note
Standard wheel version: We flew the prototype Beavers
on Power 25's and 3S Li-Po systems with plenty of power
for basic maneuvers and flight performance.
Float version: We flew the prototype Beavers on Power
32's and 4S Li-Po systems when using floats due to the
higher weight of the model with floats installed.
Mounting hardware is included for mounting either motor
combination in your Beaver.