5 start-up – Metrohm 920 Absorber Module User Manual
Page 87
■■■■■■■■■■■■■■■■■■■■■■
5 Start-up
920 Absorber Module
■■■■■■■■
79
5 Start-up
All of the Combustion IC system components have to be completely
installed before putting the 920 Absorber Module into operation; this
means:
■
The Combustion Module including ABD and optional sampler (MMS
5000) and, if necessary, the LPG/GSS Module is installed according to
the specifications in the Combustion IC operating instructions from
Analytik Jena.
■
The 920 Absorber Module is installed according to the specifications in
the manual for the 920 Absorber Module and is connected to the
Combustion Module.
■
The 930 Compact IC Flex (2.930.2560) is installed according to the
specifications in the manual for the ion chromatograph and is connec-
ted to the 920 Absorber Module.
■
The ion chromatograph is connected to a computer where the
MagIC Net software is installed.
Putting the Combustion IC system into operation
1 Starting the software
■
Switch on the PC and start the software MagIC Net.
■
Enter user name and password.
The software starts and shows the Workplace program part.
2 Switching on the instruments
■
Switch on the Combustion Module: the Combustion Oven and
the ABD, the MMS 5000 sampler or the LPG/GSS Module, if it is
present.
■
Switch on the Combustion IC system.
■
Switch on the ion chromatograph.
MagIC Net detects all of the instruments and asks if they are to be
saved to the device table.
■
Confirm all of the prompts with [Yes].