beautypg.com

Figure 20, Port valve – valve positions – Metrohm 920 Absorber Module User Manual

Page 74

background image

4.6 6-port valve

■■■■■■■■■■■■■■■■■■■■■■

66

■■■■■■■■

920 Absorber Module

3

Port 3
For connecting the sample loop.

4

Port 4
For connecting the capillary to the ion chro-
matograph.

5

Port 5
For connecting the capillary from the outlet
of the Metrosep I trap column.

6

Port 6
For connecting the sample loop.

Valve positions
The 6-port valve can have two valve position:

1

2

Figure 20

6-port valve – Valve positions

1

Filling

2

Injecting

Filling
In the Filling position, ports 2 and 3, 4 and 5, and 6 and 1 are con-
nected to each other.
The sample flows through port 1 into the 6-port valve, through the
sample loop and through port 2 out of the 6-port valve into the waste
container.
At the same time, the transfer solution flows through port 5 into the 6-
port valve and directly back out through port 4.
The sample loop is filled with the sample at this valve position.