beautypg.com

Metrohm 920 Absorber Module User Manual

Page 36

background image

4.3 Dosino for ultrapure water

■■■■■■■■■■■■■■■■■■■■■■

28

■■■■■■■■

920 Absorber Module

Port 2

6.1805.040

1 Mounting the FEP tubing

Tighten the FEP tubing on port 2 of the dosing unit.

2 Routing the FEP tubing out of the instrument

Guide the loose end of the FEP tubing out of the 920 Absorber Mod-
ule through one of the capillary openings on the back panel of the
instrument.

Connecting port 4

Prerequisites:

The PTFE capillary (6.1803.030) is threaded in through the thread
adapter (6.1618.020) and the Dosino holder (6.2057.230).

The coupling is installed on the end of the capillary.