beautypg.com

Metrohm 920 Absorber Module User Manual

Page 65

background image

■■■■■■■■■■■■■■■■■■■■■■

4 Installation

920 Absorber Module

■■■■■■■■

57

3 Connecting port 2

Cut off a piece from the PTFE capillary, 0.75 mm ID / 3 m
(6.1803.160) that is approx. 80 cm long using the capillary cutter.

Screw this piece of capillary in place at port 2 using a long pres-
sure screw.

4 Connecting port 3

Cut off a piece from the PTFE capillary, 0.75 mm ID / 3 m
(6.1803.160) that is approx. 80 cm long using the capillary cutter.

Screw this piece of capillary in place at port 3 using a long pres-
sure screw.

5 Sealing ports 4 through 7

Ports 4 through 7 are not used.

Seal each of ports 4, 5, 6 and 7 with a threaded stopper.

6 Connecting port 8

Cut off a piece from the PTFE capillary, 0.75 mm ID / 3 m
(6.1803.160) that is approx. 60 cm long using the capillary cutter.

Screw this piece of capillary in place at port 8 using a long pres-
sure screw.

7 Connecting port 9

Cut off a piece from the PTFE capillary, 0.75 mm ID / 3 m
(6.1803.160) that is approx. 5 cm long using the capillary cutter.

Screw this piece of capillary in place at port 9 using a long pres-
sure screw.

8 Connecting port 10

Screw an entire PTFE capillary, 0.75 mm ID / 3 m (6.1803.160) in
place at port 10 using a long pressure screw.

Next step

Connect
capillary/tub-
ing at port

… to

1

6-port valve (see Chapter 4.6, page 61)

2

Bottle with standard solution (see Chapter 4.5.2, page 58)

3

Bottle with check standard (see Chapter 4.5.3, page 59)

8

Absorber tube (see Chapter 4.7, page 67)