beautypg.com

Metrohm 920 Absorber Module User Manual

Page 77

background image

■■■■■■■■■■■■■■■■■■■■■■

4 Installation

920 Absorber Module

■■■■■■■■

69

On the … of
the absorber
tube

Install this accessory

side

Inlet valve holder (6.2766.010) consisting of a holder and a nut
with inlet valve (6.2824.170)

PTFE capillary 1/8 in. / 1/16 in. ID / 1.5 m (6.1803.130) (21-

8

)

bottom

Pressure screw (6.2744.010)

The loose end of the PTFE capillary 0.75 mm ID / 3 m
(6.1803.160), connected to port 8 of the 10-port valve (21-

5

).

Connecting the capillaries

6.1803.160
60 cm

6.2744.010

6.2766.010

6.2824.170

6.1803.130

6.2744.170

1 Installing the check valve

Insert the inlet valve into the holder for the inlet valve.

Tighten the nut on the holder by hand.

Screw the check valve in place on the frit of the holder.

2 Mounting the input capillary

Screw the thicker PTFE capillary (21-8) in place on the check valve
using a pressure screw (6.2744.170).

3 Mounting the outlet capillary

Tighten the loose end of the capillary (21-5) (connected to port 8 of
the 10-port valve) to the bottom of the absorber tube holder using a
pressure screw (6.2744.010).