4 installation, 1 setting up the instrument, 1 packaging – Metrohm 920 Absorber Module User Manual
Page 25: 2 checks, 3 location, 2 overview, Setting up the instrument, Packaging, Checks, Location
■■■■■■■■■■■■■■■■■■■■■■
4 Installation
920 Absorber Module
■■■■■■■■
17
4 Installation
4.1
Setting up the instrument
4.1.1
Packaging
The instrument is supplied in highly protective special packaging together
with the separately packed accessories. Keep this packaging, as only this
ensures safe transportation of the instrument.
4.1.2
Checks
Immediately after receipt, check whether the shipment has arrived com-
plete and without damage by comparing it with the delivery note.
4.1.3
Location
The instrument has been developed for operation indoors and may not be
used in explosive environments.
Place the instrument in a location of the laboratory which is suitable for
operation, free of vibrations, protected from corrosive atmosphere, and
contamination by chemicals.
The instrument should be protected against excessive temperature fluctu-
ations and direct sunlight.
4.2
Overview
Installation of the 920 Absorber Module
The 920 Absorber Module is provided with a wide array of accessories.
These accessory parts have to be installed before the instrument can be
put into operation.
Procedure
We suggest proceeding as follows to simplify the complex installation:
1.
Install the Dosino for ultrapure water including a trap column and
ultrapure water bottle (see Chapter 4.3, page 20).
2.
Install the Dosino for the absorber solution including a trap column,
bottle with absorber solution and T connector (see Chapter 4.4, page
39).
3.
Connect the 10-port valve and install the bottles for the standard
solution and a check standard (see Chapter 4.5, page 54).
4.
Connect the 6-port valve (see Chapter 4.6, page 61).
5.
Install and connect the absorber tube (see Chapter 4.7, page 67).
6.
Connect the Combustion Module and the 930 Compact IC Flex (see
Chapter 4.10, page 74).