![background image](/manuals/586233/49/background.png)
■■■■■■■■■■■■■■■■■■■■■■
4 Installation
920 Absorber Module
■■■■■■■■
41
CAUTION
Please read through the correct procedure in the manual for the 800
Dosino before you attach the Dosino on the dosing unit.
Plugging in the connection cable
1 Route the connection cable for the Dosino for the absorber solution
out of the instrument through the cable opening (6-1) in the back
panel.
2 Plug the plug for the connection cable into the MSB 1 socket.
4.4.2
Connecting the ports – Overview
Using ports
The ports on the Dosino for the absorber solution are used as follows:
Port …
… is used for …
… and is connected to
1
Liquid Handling
T connection
2
Aspirating the absorber solution
Bottle with absorber solution
3
Dosing the absorber solution
Metrosep A Trap 1 - 100/4.0
(6.1014.000) trap column inlet
4
Not used
Accessories
The following accessories have to be connected to the Dosino for the
absorber solution:
Port
Install this accessory
Port 1
FEP tubing M6 for 920, 9 cm (6.1805.040) (10-
Port 2
FEP tubing M6 for 920, 150 cm (6.1838.020) (10-
Port 3
■
PTFE capillary (6.1803.030), approx. 20 cm (10-
■
Pressure screw (6.2744.350)
■
Coupling (6.2744.080)
Port 4
–
For this step you also need:
■
Thread adapter (6.1618.020)
■
Dosino holder (6.2057.230)
■
Capillary cutter (6.2621.080)