beautypg.com

7 absorber tube, Absorber tube, Figure 21 – Metrohm 920 Absorber Module User Manual

Page 75: Connect the absorber tube

background image

■■■■■■■■■■■■■■■■■■■■■■

4 Installation

920 Absorber Module

■■■■■■■■

67

Injecting
In the Injecting position, ports 1 and 2, 3 and 4, and 5 and 6 are con-
nected to each another.
The transfer solution now flows through port 5 into the 6-port valve,
through the sample loop and back out through port 4. At the same
time, the absorber solution flows through port 1 into the 6-port valve
and directly back out through port 2.
In this valve position, the absorber solution in the sample loop is
flushed to the analyzer together with the transfer solution.

4.7

Absorber tube

Figure 21

Connect the absorber tube

5

PTFE capillary, 0.75 mm ID / 3 m
(6.1803.160)
Approx. 60 cm. Connection between the
10-port valve and the absorber tube.

8

PTFE capillary, 1/8 in. / 1/16 in. ID / 1.5
m
Connection between the absorber tube and
the Combustion Module.

The absorber tube is connected between the Combustion Module and the
10-port valve.

Accessories

The following accessories have to be connected to the absorber tube: