beautypg.com

Rockwell Automation GV3000/SE AC Drive 30-100HP, 230VAC V6.04 Hardware Ref, Install, Troubleshooting User Manual

Page 8

background image

II

GV3000/SE 230 VAC 30-100 HP Drive, Hardware Reference Version 6.04

3.2.5 Verifying Power Module Output Current Rating is Greater

Than Motor Full Load Amps .........................................................

3-9

Chapter 4

Mounting the Drive, Grounding, and Finding Wire Routing Locations
4.1

Mounting the Drive ....................................................................................

4-1

4.1.1 Verifying the Drive's Watts Loss Rating ......................................

4-1

4.2

Routing Input, Motor Output, Ground, and Control Wiring
for the Drive ..............................................................................................

4-1

4.3 Grounding the Drive ..................................................................................

4-2

Chapter 5

Installing Input Power Wiring
5.1 Installing Transformers and Reactors (Optional)......................................

5-1

5.2 Installing Fuses for Branch Circuit Protection ..........................................

5-2

5.3

Installing a Required External/Separate Input Disconnect .......................

5-2

5.4

Installing Power Wiring from the AC Input Line to the Drive's
Power Terminals .......................................................................................

5-5

5.5

Installing Power Wiring from an External DC Bus to the
Drive's Internal DC Bus Terminals ............................................................

5-5

Chapter 6

Installing Output Power Wiring
6.1

Installing Output Contactors (Optional) ....................................................

6-1

6.2

Installing Mechanical Motor Overload Protection (Optional) ....................

6-1

6.3

Installing Output Wiring from the Drive Output Terminal to the Motor .....

6-1

Chapter 7

Wiring the Regulator Board Terminal Strip
7.1 Stopping the Drive ....................................................................................

7-6

7.2

Wiring the Encoder Feedback Device (FVC Regulation Only) .................

7-6

7.3

Wiring the Signal and Control I/O .............................................................

7-9

Chapter 8

Completing the Installation
8.1 Checking the Installation ...........................................................................

8-1

8.2 Powering Up After Installation is Complete ..............................................

8-2

Chapter 9

Troubleshooting the Drive
9.1

Test Equipment Needed to Troubleshoot .................................................

9-1

9.2 Drive Alarms and Faults ...........................................................................

9-1

9.3 Verifying That DC Bus Capacitors are Discharged ..................................

9-1

9.4 Checking Out the Power Module with Input Power Off ............................

9-2

9.5 Replacement Parts ...................................................................................

9-4

Appendix A

Technical Specifications .................................................................................... A-1

Appendix B

30-100 HP GV3000/SE System Wiring Diagram ............................................... B-1