Rockwell Automation GV3000/SE AC Drive 30-100HP, 230VAC V6.04 Hardware Ref, Install, Troubleshooting User Manual
Page 7

I
Table of Contents
C
ONTENTS
Chapter 1
Becoming Familiar with the Manual
1.1
Finding Information ...................................................................................
1-1
1.2
Assumptions About the Audience .............................................................
1-2
1.3
Understanding Terms Used in this Manual ..............................................
1-2
1.4
If You Want to Know More ........................................................................
1-2
1.5
Getting Assistance from Reliance Electric ...............................................
1-2
Chapter 2
About the Drive
2.1
Identify the Drive by Model Number .........................................................
2-1
2.2
Enclosures ................................................................................................
2-2
2.3
30-100 HP GV3000/SE Drive Components and Locations ......................
2-3
2.4
Regulator Board Description .....................................................................
2-5
2.4.1 Jumper Locations and Settings ...................................................
2-7
2.4.1.1 Analog Input Speed Reference Jumper ............................
2-7
2.4.1.2 Analog Output Jumper ......................................................
2-8
2.4.2 Wiring the Terminal Strip .............................................................
2-9
2.4.3 RS-232 Communication Port .......................................................
2-10
2.4.4 Option Board Connector ..............................................................
2-10
2.4.5 Operator Interface Module Connector.........................................
2-10
2.4.6 Keypad/Display .............................................................................
2-11
2.5
Jumpers on Base Board (PISC-40) ..........................................................
2-11
2.6
Drive Kit Options .......................................................................................
2-13
Chapter 3
Planning Before Installing
3.1
Requirements for the Installation Site.......................................................
3-1
3.1.1 Making Sure Environmental Conditions are Met ........................
3-1
3.1.2 Determining Total Area Required Based on Drive
Dimensions ...................................................................................
3-2
3.1.3 Verifying the Site Provides for Recommended Air Flow
Clearances ....................................................................................
3-4
3.1.4 Verifying Power Module AC Input Ratings Match
Supplied Power .............................................................................
3-5
3.2
Wiring Requirements for the Drive ...........................................................
3-5
3.2.1 Meeting Terminal Strip Input and Output Specifications ...........
3-5
3.2.2 Determining Wire Size Requirements .........................................
3-5
3.2.2.1 Recommended Power Wire Sizes ....................................
3-5
3.2.2.2 Recommended Control and Signal Wire Sizes .................
3-6
3.2.2.3 Recommended Motor Lead Lengths .................................
3-6
3.2.2.4 Recommended Serial Communication Cable Lengths .....
3-8
3.2.3 Selecting AC Input Line Branch Circuit Fuses, Circuit
Breakers, and AC Reactors .........................................................
3-8
3.2.4 Meeting Encoder Specifications (FVC Regulation Only) ...........
3-9
3.2.4.1 Encoder Wiring Guidelines ..............................................
3-9