beautypg.com

2 mounting the drive, 3 terminal block locations, English – Rockwell Automation SP120 ACDrive 115VAC, 1Ph, 230VAC, 1Ph/3Ph, 1/4-5.0HP User Manual

Page 16: Fault relay terminal block, Control terminal block, Power terminal block

background image

2-2

SP120 AC Drive Installation and Operation

English

2.2

Mounting the Drive

Mount the drive on a flat, vertical, and level surface. The drive must be mounted
vertically (top up) for proper heat dissipation. Refer to Appendix A for drive mounting
dimensions.

Install the drive with four (4) M4 x .07 (8-32) screws. Torque the mounting screws to
1.2 Nm (11 lb/in).

Ensure that debris cover is in place when installing the drive to prevent filings, cable
insulation and dust from entering the drive.

2.3

Terminal Block Locations

Figure 2.2 shows the locations of the power, control, and fault relay terminal blocks.

Figure 2.2 – Terminal Block Locations

L 5

4

3

2

1 P24

Control terminal block

H

O 0I

L FM CM2 12 11

+1

+

* *

L1

N/L3

Power terminal block, AA01 - AA03 ratings only

U/T1 V/T2 W/T3

L2

*

(/)

+1

-

L1

N/L3 U/T1 V/T2 W/T3

*

Not Used

-

+

Power terminal block, all ratings except AA01 -AA03

L2

AL0

Fault relay

terminal block

AL1 AL2

Fault Relay
Terminal Block

All other model numbers
S12-20015LU only - L1, L2, L3

Control Terminal Block

S12-201P4LU / 202P6LU / 203P0LU

* *

*

*

Not used

Power Terminal Block