beautypg.com

Waters CORTECS 1.6 um Columns User Manual

Page 3

background image

3

CORTECS Columns

e. Initial Column efficiency Determination

1. Perform an efficiency test on the column before using it. This

test may consist of:
a.

An analyte test mixture that is commonly used in your

laboratory, and/or

b.

An analyte mixture as found on the “Performance Test

Chromatogram” which accompanied your column.

Note: If b. is performed, the isocratic efficiencies measured in

your laboratory may be less than those given on the Waters
“Performance Test Chromatogram”. This is normal. CORTECS
Columns are QC tested on ACQUITY UPLC I-Class Systems
which have extremely low system volumes. This presents a
more challenging test of how well the column was packed and
guarantees the highest quality packed column.

2. Determine the number of theoretical plates (N) and use this

value for periodic comparisons.

3. Repeat the test at predetermined intervals to track column

performance over time. Slight variations may be obtained
on two different UPLC

®

Systems due to the quality of the

connections, operating environment, system electronics,
reagent quality, column condition and operator technique.

f. VanGuard Pre-Columns

VanGuard

Pre-columns are 2.1 mm ID x 5 mm length guard

column devices designed specifically for use in the ACQUITY
UPLC System. VanGuard Pre-columns are packed with the same
CORTECS chemistries and frits as our 2.1 mm ID CORTECS
Columns. VanGuard Pre-columns are designed to be attached
directly to the inlet side of a CORTECS Column.

Note: In order to ensure void-free and leak-free connections, the
VanGuard Pre-column is shipped with the collet and ferrule NOT
permanently attached. Care must be taken when removing the
O-ring that holds these two pieces on the pre-column tubing.

CoRteCs Column

VanGuard Pre-Column

Place wrench here

Ferrule

Collet

Place wrench here

Flow

Installation Instructions

1. Remove the VanGuard Pre-column from its box and shipping

tube and remove plastic plug.

2. Orient the pre-column so that male end is facing up and

carefully remove rubber O-ring that holds collet and ferrule
in place during shipping (collet and ferrule are not yet
permanently attached).

3. Orient the CORTECS Column perpendicular to the work surface

so that column inlet is on the bottom (column outlet on top).

4. From below, insert the VanGuard Pre-column into the CORTECS

Column inlet and hand-tighten (collet and ferrule are not yet
permanently attached).

5. While pushing the VanGuard Pre-Column into the column

inlet, turn assembled column and pre-column 180˚ so that
pre-column is now on top.

6. Tighten with two 5/16” wrenches placed onto the CORTECS

Column flats and the VanGuard Pre-column hex nut (male end)
as shown above.

7. Tighten 1/4 turn to set collet and ferrule.

8. Check that the ferrule is set by loosening the connection and

inspecting the ferrule depth. A properly set ferrule depth will
resemble other connections in the ACQUITY UPLC System.

9. Reattach pre-column, apply mobile-phase flow and inspect

for leaks.