Snap-loc 24, Installation of gutter flashing, Cont.) – Metal Sales Snap-Loc 24 Installation User Manual
Page 51

© Metal Sales Manufacturing Corporation / Subject to change without notice. 10/99
SNAP-LOC 24
50
INSTALLATION OF GUTTER FLASHING
(CONT.)
2. Attach the SSR Gutter Support to the panel rib every other panel (48" O.C.) with two (2) #12-14
Self Driller XL screws. A section of Double Bead Tape Sealant is placed on the panel rib where the
SSR Gutter Support is fastened. A transit or a wire line should be used to align the SSR Gutter
Supports at a set distance from the wall. The SSR Gutter Supports can be adjusted as much as 1" to
allow the gutter to be installed in a straight line, even if the edge of the roof is not perfectly aligned.
3. Place a continuous strip of Double Bead Tape Sealant along the back lip of the Snap-Loc
Sculptured Gutter and remove the paper backing.
4. Prepare the first gutter section with a Snap-Loc Gutter End. Consider rake to gutter connection
for proper placement of Snap-Loc Gutter End. Use Double Bead Tape Sealant to seal between
the Snap-Loc Gutter End and the gutter flashing. Fasten with eight (8)
1
/
4
-14 x
7
/
8
" Stitch XL
screws or Pop Rivets.
SSR GUTTER SUPPORT
#12-14 SELF DRILLER XL
SSR SCULPTURED RAKE
(OFF MODULE)
WIRE LINE FOR
ALIGNMENT
SNAP-LOC
GUTTER END
DOUBLE BEAD
TAPE SEALANT
SNAP-LOC
SCULPTURED GUTTER
POP RIVETS
#12-14 SELF DRILLER XL
SNAP-LOC 24 PANEL
SSR GUTTER SUPPORT
DOUBLE BEAD TAPE SEALANT