SNAP-LOC 24

INSTALLATION OF PANEL

(CONT.)

GUTTER DRIP

TAPE MEASURE FOR PANEL

MODULARITY (24" O.C.)

#12-14 SELF DRILLER XL

DOUBLE BEAD
TAPE SEALANT

5. Fasten the panel to the Gutter Drip flashing and Metal Inside Closure using six (5) #12-14 Self

Driller XL screws. Fasteners must penetrate the Eave Plate below the Gutter Drip and the Metal
Inside Closure.

6. Install panel clips along the male leg of the panel at each framing member (except at the eave) as

previously shown.

7. Measure the distance from the female leg of the first panel installed. This dimension should be

an even multiple of 24"

+ 1

/

8

" for every four panels. It is very important that the dimension from

the starting panel to the last male leg, at the eave and peak, be the same dimension within a

1

/

4

"

of each other.

8. Make certain that all clips are properly installed and that the panel sidelap is properly snapped into

place. Use of a rubber mallet may be required to snap panels together at the panel clip locations.

BEFORE SNAPPED

AFTER SNAPPED