beautypg.com

Snap-loc 24, Installation of rake flashing, Starting on module starting / ending off module – Metal Sales Snap-Loc 24 Installation User Manual

Page 47: Cont.)

background image

© Metal Sales Manufacturing Corporation / Subject to change without notice. 10/99

SNAP-LOC 24

46

STARTING ON MODULE

STARTING / ENDING OFF MODULE

SSR SCULPTURED RAKE

FLOATING RAKE ANGLE

#12-14 SELF DRILLER XL

SHOULDER SELF DRILLER

SSR RAKE SLIDE

#

1

/

4

-14 X

7

/

8

" STITCH XL

DOUBLE BEAD TAPE SEALANT

#

1

/

4

-14 X

7

/

8

" STITCH XL

SSR SCULPTURED RAKE

(OFF MODULE)

FLOATING RAKE ANGLE

#12-14 SELF DRILLER XL

SHOULDER SELF DRILLER

DOUBLE BEAD TAPE SEALANT

SSR RAKE SLIDE

#

1

/

4

-14 X

7

/

8

" STITCH XL

SSR RAKE CLEAT

INSTALLATION OF RAKE FLASHING

(CONT.)

7. Attachment of the lower leg of the SSR Sculptured Rake flashing must be accomplished with the use

of a SSR Rake Slide flashing. The SSR Rake Slide will allow the rake flashing to move with the roof
panels (thermal expansion and contraction).

8. Place the SSR Rake Slide over the lower leg of the SSR Sculptured Rake and fasten it to the wall with

the proper type of fasteners every 12" O.C. max.

#12-14 X 1

1

/

4

"

#12-14 X 1

1

/

4

"