Snap-loc 24, Installation of rake flashing, Starting on module starting / ending off module – Metal Sales Snap-Loc 24 Installation User Manual
Page 47: Cont.)

© Metal Sales Manufacturing Corporation / Subject to change without notice. 10/99
SNAP-LOC 24
46
STARTING ON MODULE
STARTING / ENDING OFF MODULE
SSR SCULPTURED RAKE
FLOATING RAKE ANGLE
#12-14 SELF DRILLER XL
SHOULDER SELF DRILLER
SSR RAKE SLIDE
#
1
/
4
-14 X
7
/
8
" STITCH XL
DOUBLE BEAD TAPE SEALANT
#
1
/
4
-14 X
7
/
8
" STITCH XL
SSR SCULPTURED RAKE
(OFF MODULE)
FLOATING RAKE ANGLE
#12-14 SELF DRILLER XL
SHOULDER SELF DRILLER
DOUBLE BEAD TAPE SEALANT
SSR RAKE SLIDE
#
1
/
4
-14 X
7
/
8
" STITCH XL
SSR RAKE CLEAT
INSTALLATION OF RAKE FLASHING
(CONT.)
7. Attachment of the lower leg of the SSR Sculptured Rake flashing must be accomplished with the use
of a SSR Rake Slide flashing. The SSR Rake Slide will allow the rake flashing to move with the roof
panels (thermal expansion and contraction).
8. Place the SSR Rake Slide over the lower leg of the SSR Sculptured Rake and fasten it to the wall with
the proper type of fasteners every 12" O.C. max.
#12-14 X 1
1
/
4
"
#12-14 X 1
1
/
4
"