Snap-loc 24, Installation of metal outside closure, Steps – Metal Sales Snap-Loc 24 Installation User Manual

Page 43

background image

© Metal Sales Manufacturing Corporation / Subject to change without notice. 10/99

SNAP-LOC 24

42

INSTALLATION OF METAL OUTSIDE CLOSURE

METAL OUTSIDE CLOSURE

The Metal Outside Closure is used to close off the high end of the panel.
Proper placement of the Metal Outside Closure is necessary for correct installation of flashing.
Fasteners used at the Metal Outside Closures must not penetrate the framing members, as this
will restrict the system's ability for thermal movement.
Before installation of the Metal Outside Closure can begin, female rib must be field notched
beyond that which was done at the factory. See detail below.

STEPS

1. Slide a Compression Plate on to the end of the panel with the tab engaging the panel.
2. Apply Double Bead Tape Sealant down the female leg, across the panel and up the male leg

1

/

2

"

from the end of the panel. Double Bead Tape Sealant must completely cover all factory punched
holes. Apply a 2

1

/

2

" long pig tail of Double Bead Tape Sealant over the section of the female rib

which must be field notched.

COMPRESSION PLATE

SNAP-LOC 24 PANEL

DOUBLE BEAD TAPE SEALANT

COMPRESSION PLATE TAB

1

/

2

"

FIELD NOTCH
FEMALE RIB

Note:

Minor ribs in Snap-Loc 24 panel
are not shown for clarity reasons.

2

1

/

8

"

PIG TAIL OF DOUBLE
BEAD TAPE SEALANT