1 commissioning steps (overview), Commissioning steps (overview), Commissioning – Lenze ECSCExxx Power supply module User Manual
Page 61

Commissioning
Commissioning steps (overview)
l
61
EDBCSXE040 EN 7.0
6.1
Commissioning steps (overview)
Start
Make basic
settings
(
^ 62)
Operation via system bus (CAN) with
higher−level master
(
^ 64)
Control via digital inputs
(
^ 65)
Configure system bus (CAN)
Digital inputs
Set X6/DI1, DI2 = HIGH
Digital inputs
Set X6/DI1, DI2 = HIGH
Specify control word
Specify control word
Configure monitoring
functions
(
^ 101)
l
Save parameters in the power supply
module with C0003 = 1.
l
Save parameter set with GDC in the
parameter set file.
Switch on the mains
End