beautypg.com

6 commissioning, 1 before initial switch-on, Commissioning – Lenze E94AYCDN User Manual

Page 30: Before initial switch-on, 6commissioning

background image

6

Commissioning

6.1

Before initial switch-on

30

Lenze · E94AYCDN communication module (DeviceNet™) · Communication Manual · DMS 5.0 EN · 02/2014 · TD17

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

6

Commissioning

During commissioning, system-related data such as motor parameters, operating parameters,

responses, and parameters for fieldbus communication are defined in the drive. For Lenze devices,

this is done by means of codes.
The codes of the drive and communication are saved non-volatilely as a data set in the memory

module.
In addition to codes for the configuration, there are codes for diagnosing and monitoring the nodes.

6.1

Before initial switch-on

Note!

When parameterising the communication module, please note that the code number

depends on the slot of the standard device which the communication module is plugged

into.
The first two digits of the code number specify the slot:

• C13nnn for slot MXI1

Parameters of the communication module for the MXI1 slot

( 50)

• C14nnn for slot MXI2

Parameters of the communication module for the MXI2 slot

( 57)

Furthermore set

Communication-relevant parameters of the standard device

( 48)

.

Stop!

Before switching on the standard device with the communication module for the first

time, check ...

• the entire cabling for completeness, short circuit and earth fault.
• whether the bus system is terminated at the first and last physical node by means of

a bus terminating resistor (120 ).