Appendix a, Linkpower supply kit, Installation procedure – ETC SmartPack v2.1.0 User Manual
Page 29: A p p e n d i x a, Appendix a linkpower supply kit
A
LinkPower Supply Kit
25
Appendix A
LinkPower Supply Kit
One SmartLink LinkPower Supply (S-LPS) powers up to four wall stations over the
SmartLink™ network.
Due to the similar design for the SmartPack Wall Mount and the SmartSwitch Relay Panel
control terminations, the following instructions may be used for either product.
Installation Procedure
The LinkPower supply kit includes a LinkPower supply and four screws.
Step 1:
Remove power from the control electronics.
a: For a SmartPack Wall Mount, turn the Standby breaker off.
b: For a SmartSwitch relay panel, turn the circuit breaker off at the breaker
panel.
Step 2:
Remove the two screws securing the I/O panel to the chassis.
Step 3:
Fold the I/O panel down to reveal the control terminations.
Step 4:
Angle the LinkPower supply board approximately 10° and insert the four pins as
found on the LinkPower supply into the receptacle on the I/O board.
Step 5:
Align the LinkPower supply with the four screw mounts located on the I/O panel
and secure with the four screws provided. Do not over tighten the screws.
Step 6:
Close the I/O panel and secure with the two screws.
Step 7:
Re-apply power to the control electronics.
N o t e :
You may have only one station power source on the SmartLink network. This
source may be either the LinkPower Supply (S-LPS) or a SmartLink Station Power
Module (S-SPM) which powers up to 16 SmartLink stations. As well, you may
have up to four SmartLink host products in a SmartLink system. One SmartLink
host product (SmartPack, SmartSwitch, Unison DRd with SmartLink or Sensor +
with SmartLink) in the system must have a LinkPower Supply or Station Power
Module installed for wall station power.
Step 4
Step 5
LinkPower
supply
I/O board