Burnham Series 5B User Manual
Page 38

38
2.
INSTALLATION OF GAS VALVE TRANSFORMER
AND COMPLETION OF WIRING - Attach the
bracket for mounting of the junction box to the lower
front corner of the Jacket Upper End Panel using two
#10-32 x ½” MS and nuts. Mount junction box to
bracket using #8 SMS, see Figures 38 and 39. Install
Transformer on junction box.
“THERMOCOUPLE CONTROL SYSTEM”
CANADA ONLY
FIG. 38
PILOT PIPING
THERMOCOUPLE CONTROL SYSTEM
CANADA ONLY
FIG. 39
NOTE - TWO PILOT SAFETY SWITCHES REQUIRED
ON 15 SECT. AND LARGER BOILERS.
INSTALLATION OF PILOT SAFETY SWITCH
THERMOCOUPLE CONTROL SYSTEM
SecTiON iii – iNSTALLATiON iNSTRUcTiONS (continued)
                    See also other documents in the category Burnham Water boiler:                                                            
                    - 81433101R16-1/10 (40 pages)
 - Gas-Fired (4 pages)
 - Independence IN8 (1 page)
 - Independence IN9 (92 pages)
 - ALP105 (100 pages)
 - 53A (22 pages)
 - CHG150 (72 pages)
 - Series 2B (52 pages)
 - LEDV-3 (1 page)
 - ALP399 (3 pages)
 - MST513 (4 pages)
 - HF SERIES (28 pages)
 - SL AL119SL (1 page)
 - PVG (64 pages)
 - Independence PV (6 pages)
 - V9A (64 pages)
 - SERIES 3 1099-01R1-/10 (8 pages)
 - RSA (52 pages)
 - E4 (8 pages)
 - SCG 1100-H4 (96 pages)
 - SERIES 2 (6 pages)
 - MEGASTEAM MST396 (68 pages)
 - V7 SERIES (47 pages)
 - V9 (4 pages)
 - LE L7248 (28 pages)
 - LEDV SERIES (36 pages)
 - MST396 (64 pages)
 - ES2 (52 pages)
 - ALP080 (7 pages)
 - Minuteman II (6 pages)
 - PVG & SCG (4 pages)
 - V8 Series (100 pages)
 - FCM120 (80 pages)
 - Carefree DOE (3 pages)
 - 20_PV_I (32 pages)
 - BOILERS (48 pages)
 - MPO Series (4 pages)
 - V8H Series (2 pages)
 - 8H (92 pages)
 - SM-6 (28 pages)
 - SCG (92 pages)
 - CHG (4 pages)
 - ALPINE (8 pages)
 - MULTI-PASS (108 pages)
 - C4 SERIES (2 pages)
 
