beautypg.com

Appendix a - figures – Burnham Series 5B User Manual

Page 106

background image

106

APPeNDiX A - FiGUReS

Figure

Number

Page

Number Description

Section i - equipment Check list

USA

KD Boilers

2 & 3

U.S.A. Equipment Check List

Canada

KD Boilers

4 & 5

Canadian Equipment Check List

Figure 1

6

Dimensional Data

Section ii - General Information

Section iii - installation instructions

Fig. 2

8

Single Manifold Base 5006B Thru 5014B Section Boilers

Fig. 3

9

Dual Manifold Bases - 5015B Thru 5026B Section Boilers

Fig. 4

9

LEH Section on Base

Fig. 5

9

Assembly of Center Sections

Fig. 6

10

Arrangement of Sections and Canopy(s)

Fig. 7

11

Purpose of Tappings and Their Locations

Fig. 8

12

Installation of Built-in Heater

Fig. 9

12

Testing Boiler Assembly for Leaks

Fig. 10

13

Sealing of Base, Installation of Flue Covers and Canopies

Fig. 11

13

Attachment of Flue Covers

Fig. 12

14

Recommended Steam Boiler Piping, Gravity Return, 1 or 2 Supply Connections - 5006B Thru 5014B Section Boilers

Fig. 13

15

Recommended Steam Boiler Piping, Gravity Return, 3 Supply Connections - 5015B Thru 5020B Section Boilers

Fig. 14

16

Recommended Steam Boiler Piping, Gravity Return, 4 or 5 Supply Connections - 5021B Thru 5026B Section Boilers

Fig. 15

17

Typical Steam Piping Arrangement for Boilers with Pumped Condensate Return and Boiler Feed Unit

Fig. 16A

18

Recommended Water Boiler Piping 1 Supply Connection and 1 Return Connection, Sizes 5006B Thru 5019B Section

Boilers

Fig. 16B

18

Recommended Water Boiler Piping, 3 Supply Connections and Two Return Connections, Sizes 5020B Thru 5026B

Section Boilers

Fig. 17

19

Recommended Boiler Piping for Combination Heating and Cooling Systems

Fig. 18

19

Installation of Jacket Support Brackets to Base End Panels

Fig. 19

20

Installation of Jacket End Panels

Fig. 20

20

Vestibule Attachment Diagram

Fig. 21

21

Exploded View of Jacket, 5006B Thru 5010B Section Boilers

Fig. 22

22

Securing of Canopy/Draft Hood

Fig. 23

23

Canopy/Draft Hood Mounting Diagram

Fig. 24

24

Exploded View of Jacket, 5011B Thru 5019B Section Boilers

Fig. 25

26

Exploded View of Jacket, 5020B Thru 5022B Section Boilers

Fig. 26

27

Exploded View of Jacket, 5024B Thru 5026B Section Boilers

Fig. 27

28

Steam Trim and Controls

Fig. 28

29

Mounting Elevations of M&M 150 and a 67M Float LWCO

Fig. 29

30

Water Trim and Controls

Fig. 30

31

Recommended Piping to Built-in Tankless Heaters

Fig. 31

33

Installation of S8610M Module

Fig. 32

33

Pilot Piping - EI Control System (Robertshaw7000) USA 5006B Thru 5009B

Fig. 33

34

Pilot Piping - EI Control System (V88A) USA 5010B Thru 5026B - Nat. Gas; Canada - 5006B Thru 5026B - Nat. Gas

Fig. 34

35

Installation of Pilot Safety Switch, OP Control System

Fig. 35

35

Pilot Piping, OP Control System

Fig. 36

36

Installation of OP and EP Mounting Bracket and Controls

Fig. 37

37

Pilot Piping, EP Control System