Appendix a - figures – Burnham Series 5B User Manual
Page 106

106
APPeNDiX A - FiGUReS
Figure
Number
Page
Number Description
Section i - equipment Check list
USA
KD Boilers
2 & 3
U.S.A. Equipment Check List
Canada
KD Boilers
4 & 5
Canadian Equipment Check List
Figure 1
6
Dimensional Data
Section ii - General Information
Section iii - installation instructions
Fig. 2
8
Single Manifold Base 5006B Thru 5014B Section Boilers
Fig. 3
9
Dual Manifold Bases - 5015B Thru 5026B Section Boilers
Fig. 4
9
LEH Section on Base
Fig. 5
9
Assembly of Center Sections
Fig. 6
10
Arrangement of Sections and Canopy(s)
Fig. 7
11
Purpose of Tappings and Their Locations
Fig. 8
12
Installation of Built-in Heater
Fig. 9
12
Testing Boiler Assembly for Leaks
Fig. 10
13
Sealing of Base, Installation of Flue Covers and Canopies
Fig. 11
13
Attachment of Flue Covers
Fig. 12
14
Recommended Steam Boiler Piping, Gravity Return, 1 or 2 Supply Connections - 5006B Thru 5014B Section Boilers
Fig. 13
15
Recommended Steam Boiler Piping, Gravity Return, 3 Supply Connections - 5015B Thru 5020B Section Boilers
Fig. 14
16
Recommended Steam Boiler Piping, Gravity Return, 4 or 5 Supply Connections - 5021B Thru 5026B Section Boilers
Fig. 15
17
Typical Steam Piping Arrangement for Boilers with Pumped Condensate Return and Boiler Feed Unit
Fig. 16A
18
Recommended Water Boiler Piping 1 Supply Connection and 1 Return Connection, Sizes 5006B Thru 5019B Section
Boilers
Fig. 16B
18
Recommended Water Boiler Piping, 3 Supply Connections and Two Return Connections, Sizes 5020B Thru 5026B
Section Boilers
Fig. 17
19
Recommended Boiler Piping for Combination Heating and Cooling Systems
Fig. 18
19
Installation of Jacket Support Brackets to Base End Panels
Fig. 19
20
Installation of Jacket End Panels
Fig. 20
20
Vestibule Attachment Diagram
Fig. 21
21
Exploded View of Jacket, 5006B Thru 5010B Section Boilers
Fig. 22
22
Securing of Canopy/Draft Hood
Fig. 23
23
Canopy/Draft Hood Mounting Diagram
Fig. 24
24
Exploded View of Jacket, 5011B Thru 5019B Section Boilers
Fig. 25
26
Exploded View of Jacket, 5020B Thru 5022B Section Boilers
Fig. 26
27
Exploded View of Jacket, 5024B Thru 5026B Section Boilers
Fig. 27
28
Steam Trim and Controls
Fig. 28
29
Mounting Elevations of M&M 150 and a 67M Float LWCO
Fig. 29
30
Water Trim and Controls
Fig. 30
31
Recommended Piping to Built-in Tankless Heaters
Fig. 31
33
Installation of S8610M Module
Fig. 32
33
Pilot Piping - EI Control System (Robertshaw7000) USA 5006B Thru 5009B
Fig. 33
34
Pilot Piping - EI Control System (V88A) USA 5010B Thru 5026B - Nat. Gas; Canada - 5006B Thru 5026B - Nat. Gas
Fig. 34
35
Installation of Pilot Safety Switch, OP Control System
Fig. 35
35
Pilot Piping, OP Control System
Fig. 36
36
Installation of OP and EP Mounting Bracket and Controls
Fig. 37
37
Pilot Piping, EP Control System