INSTALLATION OF BLEED PIPING – Using ¼” OD

aluminum tubing, install a bleed line on both diaphragm

valves, connect together, see Fig. 27 or 29 and run

FIG. 34

INSTALLATION OF PILOT SAFETY SWITCH

OP CONTROL SYSTEM

FIG. 35

PILOT PIPING

OP CONTROL SYSTEM

SecTiON iii – iNSTALLATiON iNSTRUcTiONS (continued)

tubing to bleed line protruding from inside base, see

Fig. 35. On boiler installed in Canada, run bleed line to

outdoors.

3.

INSTALLATION OF “OP” PANEL AND WIRING

OF PILOT AND PILOTSTAT – Attach the OP Control

Panel with RM7890 control, see Fig. 36, to the front

top jacket panel, preferably on the closest jacket panel

to the gas train installed. There are (3) three KO’s and

(4) four fastener holes provided for this purpose, use (4)

four #8 SMS to fasten the Control Panel to the front top

jacket panel.

Connect the two wires from the Q179D pilot to the

RM7890 sub-base as follows:
a. Ground Wire (200ºC) to the “12” terminal
b. Flame detector wire (Honeywell 1298020) to “11”

terminal

c. Thermocouple Lead to L62 Pilotstat.

Wire the pilotstat to the gas valve transformer and to the

V88A Gas Valves using the 105ºC wire furnished, see

Fig. 46 or 47. If Foot Mounted transformer, connect to

J-box using straight connector, BX, straight connector

and ½” pipe coupling. Drill holes in Jacket and fasten

Transformer with SMS.