Removing hdlm, Preparations for hdlm removal, Removing hdlm -22 – HP Hitachi Dynamic Link Manager Software User Manual
Page 74: Preparations for hdlm removal -22, Preparations for
5
.
In Interval Timer(Sec), enter a value to shorten the monitoring cycle.
The default is 10 (seconds). You can specify a value from 1 to 300.
6
.
In Lookout Span(Sec), enter a value to specify the interval for
monitoring the number of messages to be output to the integrated trace
file.
The default is 0 (seconds). You can specify a value from 0 to 3600.
If you specify 0, you cannot adjust the number of messages to be output
because the system ignores the setting of Max Messages / Span.
7
.
In Max Messages / Span, enter a value to specify the maximum
number of messages to be output to the integrated trace file at the
monitoring interval specified in Lookout Span(Sec).
The default is 0. You can specify a value from 0 to 500.
If you specify 0, you cannot adjust the number of messages to be output.
If you specify 0 for Lookout Span(Sec), you cannot adjust the number
of messages to be output because the system ignores the Max
Messages / Span setting.
8
.
After you finish changing the settings, click the OK button.
The dialog box closes.
9
.
Close all of the Hitachi program products that are using Hitachi Network
Objectplaza Trace Library, or restart the remote management client.
If you choose to restart the remote management client, you do not need
to perform step 10.
10
.
Restart the services of the HDLM manager and Hitachi Network
Objectplaza Trace Library for the Hitachi Network Objectplaza Trace
Library settings to take effect.
From Control Panel, choose Administrative Tools and then Services
to open the Services window.
From the list of services, select DLMManagerVM. Then, from the Action
menu, choose Restart to restart the service.
Next, from the list of services, select Hitachi Network Objectplaza
Trace Monitor 2. Then, from the Action menu, choose Restart to
restart the service.
Removing HDLM
This section explains how to return the operating environment to the way it
was before HDLM was installed.
Preparations for HDLM Removal
•
Back up all the data on the host where HDLM is installed. Also, if
necessary, back up the data on the management target device.
•
Shut down any application processes and services, such as DBMS, that
use a path managed by HDLM.
3-22
Creating an HDLM Environment
Hitachi Dynamic Link Manager User Guide for VMware
®