beautypg.com

HP XP Application Performance Extender Software User Manual

Page 44

background image

grace period of 60 days. In such a case, if you install the appropriate TB-Days, P9000 Application
Performance Extender ends the grace period for that particular P9500 disk array.

Example scenario 8

Consider the following points:

1.

A P9500 disk array has a usable capacity of 75TB.

2.

A Permanent license is installed on 11/24/2010 to monitor the 75TB usable capacity.

3.

Due to a surge in storage requests around 11/30/2010, another 20TB usable capacity is added
for a duration of five days.

4.

Because this is a short term unplanned request, it is addressed by installing 100TB-Days of Meter
based Term license on 11/30/2010.

5.

As the usable capacity is beyond the Permanent licensed capacity, P9000 Application Performance
Extender uses the 100TB-Days of Meter based Term license.
Based on the usable capacity consumed, P9000 Application Performance Extender uses the
appropriate TB-Days of Meter based Term license. Following are sample consumptions from day
1 to day 3:
• 11/30/2010: 51.5TB monitored using 52TB-Days
• 12/01/2010: 20.3TB monitored using 21TB-Days
• 12/02/2010: 24.9TB monitored using 25TB-Days

6.

As 4TB usable capacity is remaining and only 2TB-Days are available, P9000 Application Per-
formance Extender does the following:

a.

Enters 60 days grace period after 1:00 PM on 12/02/2010 and updates the following
fields with the latest TB-Days data:
• License Capacity: Displays 75TB, +2TB-Days
• License Status: Capacity Insufficient
• Term (Days): 0
• End Date: Expired

b.

Begins reducing the installed TB-Days by 20TB every day starting from 12/03/2010, which
is shown as follows:
• On 12/03/2010, 2TB-Days are reduced to –18TB-Days
• On 12/04/2010, –18TB-Days are reduced to –38TB-Days
• On 12/05/2010, –38TB-Days are reduced to –58TB-Days

7.

The reduction in TB-Days continues till you install the appropriate TB-Days of Meter based Term
license, so that P9000 Application Performance Extender does the following:
• Shows positive TB-Days
• Ends the grace period for the particular P9500 disk array

8.

So, if you want to install TB-Days on 12/05/2010 for a duration of five days, generate 160TB-
Days of Meter based Term license. Out of the 160TB-Days:
• 60TB-Days (3 days * 20TB) are used to nullify the reduction in installed TB-Days.
• 100TB-Days (5 days * 20TB) is required for P9000 Application Performance Extender to

continue monitoring the 20TB usable capacity for another five days.

With 160TB-Days, P9000 Application Performance Extender ends the grace period and continues
to monitor the 20TB usable capacity for another five days.

Licensing P9500 disk arrays

44

This manual is related to the following products: