beautypg.com

Starting the subsystem, Starting the subsystem –5 – HP Array Controller HSG V8.7 Software User Manual

Page 41

background image

Operating the UltraSCSI Enclosure

UltraSCSI RAID Enclosure 2–5

See Table 2–1 for the Compaq-supported PVA SCSI ID switch
settings.

Starting the Subsystem

After assembling an enclosure and connecting enclosure cabling,
power is applied to start the subsystem.

Note

Before applying power to the subsystem, configure the
entire subsystem (including the host and the array
controller) as described in the appropriate publications.

Applying power to all the enclosures causes the EMU, PVA, and
array controller to automatically begin system operations.

Table 2–1

Compaq-Supported PVA SCSI ID Switch
Settings

Total Number

of Enclosures

Master

Enclosure

First

Expansion

Second

Expansion

1

0

None

None

2

0

2

None

3

0

2

3