beautypg.com

A.O. Smith 3400 User Manual

Page 28

background image

28

HORIZONTAL INSTALLATION REQUIREMENTS

1. The vent system must terminate with the Through-the-Wall

Termination (TWT) kits. Do not locate the terminal within 8

feet (2.4 m) of an inside corner of a building or adjacent to

outside walls, shrubs or other such objects that may cause

adverse wind conditions in the immediate area.

2. 2. The TWT should be located not less than 12 inches (305

mm) above grade or, in geographical areas where snow

accumulates, no less than 12 inches (305 mm) above

anticipated snow line. Ensure that TWT is protected against

blockage which may occur during ice buildup or snowstorms.

The TWT should terminate at least 3 feet (0.9 m) above

any forced air inlet within 10 feet (3 m), except when the

forced air inlet is the combustion air intake of a direct vent

appliance. The TWT should terminate at least 4 feet (1.2

m) below, 4 feet (1.2 m) horizontally from or 1 foot (305

mm) above any door, window or gravity air inlet into any

building as provided in the current edition of the national fuel

gas code ANSI Z223.1. In addition, a minimum clearance

of 4 feet (1.2 m) horizontally from, and in no case above

or below, unless the 4 feet (1.2 m) of horizontal distance is

maintained from electric meters, gas meters, regulators and

relief equipment.

3. This horizontal exhaust vent system must pitch upward

toward the termination at 1/4 inch per foot (21 mm per

meter).

4. The TWT is designed such that the building is protected

from degradation by flue gas and condensate. However,

if additional protection is desired, install against the wall a

non-corrosive metal sheet under the TWT.

5. Due to the normal formation of water vapor in the combustion

process, horizontal terminations must not be located over

areas of pedestrian or vehicular traffic, (i.e., public walkways

or over areas where condensate could create a nuisance or

hazard). This is especially true in colder climates where ice

buildup is likely to occur. A. O. Smith Corporation will not be

held liable for any personal injury or property damage due to

any dislodging of ice.

DIRECT VENT INSTALLATION REQUIREMENTS

The labels in the Direct Vent Kit must be affixed to the boiler in

locations specified by the instruction sheet provided in the kit.

The following are requirements for the Air-Intake Terminal (AIT):
1. The Air-Intake System (AIS) must terminate with the venting

equipment provided with the boiler.

2. The AIT should not be located less than 3 feet (0.9 m) below

any exhaust vent within 10 feet (3 m).

3. The total horizontal distance of the AIS from the boiler’s

Blower Adapter to the outside of the “AIT” should not be

greater than 100 equivalent feet (30.5 m) of vent pipe nor

less than 3 feet (0.9 m), including elbows.

VENTING SUPPORTS

Care must be taken in the installation of the venting system

that adequate support is maintained throughout the installation

process. When extending more than 10 feet (3 m) vertically,

vertical support kits are required once every 10 feet (3 m) of

vertical run. Vertical support is also required immediately after

any transition (elbow, tee, etc.) to vertical of over 10 feet (3 m) of

run and after any offset in the vertical run.
The support brackets (supplied in the Vertical Support Kit)

are to be securely fastened to a solid vertical member of the

building using the appropriate fasteners; i.e., wood screws for

wood framing, machine or tapping screws for structural steel

or masonry anchors for solid masonry. The bracket should be

located so that it will not interfere with any joints of the venting

system. The bottom most support bracket should be located

directly above the first transition from horizontal to vertical.
If a means of support for the brackets is not available and

horizontal vent sections are present, install hanger straps

(made from non-combustible material) as close to the points of

transition as possible. If the horizontal portions of the vent and/or

vent connector are longer than 6 feet (1.8 m), then install hanger

straps every 6 feet (1.8 m) to support the connector.
Do not rivet or screw the straps to the conduit or otherwise

puncture the conduit wall. Instead, wrap an extra loop of strap

around the conduit to hold it in position, or attach the strap to

the center screw of the double wall AL 29-4C® vent coupling, if

applicable.

VERTICAL INSTALLATION REQUIREMENTS

1. The vent system must terminate at least 3 feet (0.9 m) and

no more than 6 feet (1.8 m) above the roof line and no closer

than 10 feet (3 m) from any wall or vertical structure. If the

exhaust vent terminal is within 10 feet (3 m) of a wall or

parapet, it must extend a minimum of 2 feet (0.6 m) above

the wall or parapet, see Figure 24 on Page 29 and Figure

27 on Page 30.

2. For direct vent installations, the total distance of the vent

system from the boiler vent connector to the vertical vent

termination should not exceed 100 equivalent feet (30.5 m).

Minimum vertical vent is 10 equivalent feet (3 m) for direct

vent installations. Standard minimum vertical vent length is

10 feet (3 m). See Figure 24, Figure 27 thru Figure 29 for

differences between standard and direct vent installations.

3. Maintain a minimum of 4 feet (1.2 m) separation between

the air intake and the exhaust terminals.

This manual is related to the following products: