beautypg.com

9 .8 factory acceptance test check – KROHNE Summit 8800 Vol 3 User Manual

Page 157

background image

157

www.krohne.com

08/2013 - MA SUMMIT 8800 Vol3 R02 en

SUMMIT 8800

GENERAL INFORMATION

09

Figure 210 Calculation code and help

Press help on this page to get the full LUA help, including all Summit additions to the language.

For further details, refer to the internet or contact KROHNE.

9 .8 Factory acceptance test check

Liquid

Gas

Steam

To verify a configuration and to do a regular parameter check it is very useful and more accurate

to simulate the measurements by software instead of the need for hardware signal generators.

Furthermore to check the full range of the calculations, normally these simulated values must

regularly be manually. This is time-consuming and error prone.

The FAT check is designed to do all of this automatically. A list of settings and the time to change

them can be created and in maintenance mode this list can be processed automatically.

This means that all steps (e.g. a day worth of steps) for an FAT can be done without supervision

after which the generated reports can be compared with the expected results.

The configuration of the steps is as follows: