BoilerSpection HD/SD Manual
BoilerSpection Installation Guide 32
3.5.3 Electrical Connections – BoilerSpection SD
1. Connect temporary power to the camera.
In a later step of the installation, the permanent power and flexible conduit will be
installed. A power connection is located at the rear of the housing.
Connect a VAC power cable to the power connector. (see Figure 25).
Figure 25: BoilerSpection SD Power Connection
2. Connect power to the Retraction System Control Box.
Two options are available for providing power to the BoilerSpection System:
Option 1: 100-240VAC, 47-63 Hertz power directly to each Retraction System Control
Box.
Option 2: 100-240VAC, 47-63 Hertz power can be supplied to a LumaSense Part #21844
Assembly, Power Panel. This power panel is then used to distribute power to each
Retraction System Control Box.
The 100-240VAC, 47-63 Hertz supply to the Retraction System Control Box goes through a
breaker and is then split using terminal blocks. It is split to supply an AC to DC power supply
for the Retraction System Controls and an AC to DC power supply for the camera.
Note: If the entire system or an individual Retraction System loses power the
affected cameras will retract using air pressure. The cameras will not reinsert until
power is restored.
3. Connect power to the Field Switch Enclosure (FSE).