BoilerSpection HD/SD Manual
BoilerSpection Installation Guide 30
Figure 22: SD Camera Air Filtration System
A. ½” Regulator
B. Final-Filter
C. Pre-Filter
D. 1” Regulator
E. 1” Check Valve
F. Brass Pressure Switch
G. Power Cable
H. Conduit Body
I. Power Cable
J. Solenoid Assembly
K. ½” Check Valve
Follow standard practices to ensure that air lines are clean before connecting. Check for proper flow
after installation. Plant air supply to the air filtration system is through a 1” NPT ball valve fitting.
Caution: The system requires 40 scfm at 100 psi at each camera location.