beautypg.com

3 preparing the boiler, Preparing the boiler – LumaSense Technologies BoilerSpection-SD User Manual

Page 22

background image

BoilerSpection HD/SD Manual

BoilerSpection Installation Guide 22

3.1.3 Preparing the Boiler

Select the location on the furnace or boiler where you will be mounting each of the BoilerSpection
camera systems. Consideration should be given to the location of the desired scene to be

monitored, the opening in the wall, access to the site, support members, internal furnace/boiler
conditions, etc. Selecting the best location can depend on the unique behavior of individual
furnaces; and final location decisions must be made by the user.

Note: LumaSense offers site survey services to help customers evaluate camera
position, selection, and installation / mounting planning. Please contact LumaSense
Field Services to discuss site survey support.

Figure 13: Example BoilerSpection SD Installation

Note: The camera will exhaust some air into the furnace through the lens

cooling/purge and, in some installations, the purge for the retraction device wall box.

See Figure 14 for the definitions and corresponding numbers of the main components in the
BoilerSpection camera and retract device system.

This manual is related to the following products: