Operation, 1 operational conditions for positioning operation – IAI America RCA2-TW4N User Manual
Page 60

52
7. Operation
7.
Operation
7.1
Operational Conditions for Positioning Operation
By following the procedures below, check whether the operation is available.
[1] Usage conditions
Check the operational conditions [1] to [6].
[1] Load installation orientation (horizontal, upright, vertical)
[2] Stroke L (mm)
[3] Maximum speed V (mm/s)
[4] Acceleration a (G)
[5] Loading capacity W (kg)
[6] Overhang T (mm): Distance from the end face of the table to the center of gravity of the load
Installation orientation Fig. 1
l
a
c
i
t
r
e
V
t
h
g
i
r
p
U
l
a
t
n
o
z
i
r
o
H