beautypg.com

Zero and span checks, Zero/span check procedures, 9 zero and span checks -22 – Teledyne 6200A - Sulfides analyzer User Manual

Page 129

background image

TAI Model 6200A SO

2

Analyzer Operator Manual, 02164, Rev. G

7.8.9 ZERO and SPAN Checks

A system of Level 1 and Level 2 zero span checks (see Table 7-1) is recommended. These
checks must be conducted in accordance with the specific guidance given in Subsection 9.1 of
Section 2.0.9 (Q.A. Handbook). It is recommended Level 1 zero and span checks conducted
every two weeks. Level 2 checks should be conducted in between the Level 1 checks at a
frequency desired by the user. Span concentrations for both levels should be between 70 and
90% of the measurement range.

Zero and span data are to be used to:

1. provide data to allow analyzer adjustment for zero and span drift;

2. provide a decision point on when to calibrate the analyzer;

3. provide a decision point on invalidation of monitoring data.

Items 1 and 2 are described in detail in Subsection 9.1.3 of Section 2.0.9 (Q.A. Handbook). Item
3 is described in Subsection 9.1.4 of the same section.

Refer to the Troubleshooting Section 9 of this manual if the instrument is not within the allowed
variations.

7.8.9.1 Zero/Span Check Procedures

The Zero and Span calibration can be checked a variety of different ways. They include:

1. Manual Zero/Span Check.

Zero and Span can be checked from the front panel keyboard. The procedure is in Section 7.1
of this manual.

2. Automatic Zero/Span Checks

After the appropriate setup, Z/S checks can be performed automatically every night. See
Table 6-2 and Section 7.4 of this manual for setup and operation procedures.

3. Zero/Span checks via remote contact closure

Zero/Span checks can be initiated via remote contact closures on the rear panel. See Section
7.7 of this manual.

4. Zero/Span via RS-232 port

Z/S checks can be controlled via the RS-232 port. See Section 6.8.5 of this manual for more
details.

7-22