beautypg.com

Revive after storage routine – Luminex MAGPIX Hardware and Installation Manual User Manual

Page 46

background image

FIGURE 36.

Sample Probe Height Adjustment

Revive After Storage Routine

NOTE: The Revive After Storage routine is necessary when the system

runs for the first time and is recommended when the system has
been idle for more than a week.

After you have adjusted the sample probe height, run the Revive After Storage (Luminex)
routine.

1. Open the Maintenance page, then the Cmds & Routines tab.

2. Select Revive After Storage (Luminex) from the drop-down list. The Revive After

Storage routine performs the following commands:

Prime

Rinse

Alcohol Flush

Rinse

3. Add 70% isopropanol or ethanol to reservoir RB1 on the off-plate reagent block as

indicated on the Cmds & Routines tab.

NOTE: The rinse reservoir (RD1) should be empty.

4. Click Retract.

5. Click Run.

After the Revive After Storage routine is complete, run the System Initialization routine.

Installation Procedure

33