Draw-Tite 30035 FIFTH WHEEL RAILS User Manual
Page 18
![background image](/manuals/293213/18/background.png)
DODGE THROUGH 93 (FULL SIZE)
CAUTION!
Read pages 2-3 of these instructions before starting installation. Failure to do so could result in significant vehicle damage!
IMPORTANT NOTES FOR THIS INSTALLATION:
1. May need to move base rail location +/- 1/2” to ensure frame brackets do not interfere with bed sills.
29-5/8” Long Box
and Short Box
Front
of
Vehicle
Rear Edge of
Truck Bed
Measure from Rear Edge of truck
bed to rear edge of base rail.
R
O
W
1
R
O
W
2
R
O
W
3
R
O
W
4
NOTE:
Must install center bolt in
one of the center holes in
each rail.
z 2006,2007,2008,2009,2010,2011,2012,2013 Cequent Performance Products, Inc.
Made in China
30035IN
9/4/13
Rev. R
Side Bracket
*
Optional weld
pattern
Drivers side of 1/2 ton Ram Shown
1/4 1.5-3
1/4 2
*
1/4 2
1/4 2
*
Long bracket
Short bracket
King Pin Centered over Axle
Axle Center
Bed Sill
CAUTION!
Check for obstructions before drilling. Failure to do so could result in damaged fuel or brake lines, structural members, etc.
CEQUENT PERFORMANCE PRODUCTS, INC. does its best to communicate tow vehicle manufacturer changes; however, it is
ultimately the responsibility of the installer to prevent damage due to installation.
bed to rear edge of base rail.
SHEET 17 0F 21
each rail.
Check to make sure center
bolt does not interfere with
bed sill.
Front
of
Vehicle