beautypg.com

Receipt and storage, Installation information, Installation – M&C TechGroup DIL-1_(H) Operator's manual User Manual

Page 18: Connection of the supply or sample lines

background image

18

Gas sampling and gas conditioning technology

2-1.1.7.6-ME

11

RECEIPT AND STORAGE

Carefully remove the dilution unit and any accessories from the transport packaging immediately af-

ter receipt and check the completeness of the delivery against the packing list.

Check the goods for possible transport damages and, if necessary, notify immediately your trans-

port insurer of any damage.

N O T E !

The dilution unit should be stored in a protected, frost-free room!



12

INSTALLATION INFORMATION

The safety rules and regulations for the prevention of accidents must be observed during installation
and also subsequent operation.

The information in chapter 3 “Important Safety Information“ must be

observed.

The following also applies:

Select the optimal sampling point according to the generally applicable directives or coordinate
with the responsible departments.

N O T E !

The dilution unit must be checked for its suitability for use with the available
operating parameters prior to installation (see type plate).



13

INSTALLATION

The M&C dilution units DIL-1... are designed for stationary use. With correct selection of the sample
point and proper installation, they will work for many years with a minimum of maintenance required.

13.1

CONNECTION OF THE SUPPLY OR SAMPLE LINES

N O T E !

Increases of pressure due to use of long sample gas lines at the outlet may
have a great influence on the measuring result. For this reason, we recom-
mend the following nominal widths and lengths for the sample lines in de-
pendence on the type of injector:
Injector type I:

i

6mm max. 50m

i

8mm max. 150m

Injector type II:

i

8mm max. 15m

i

10mm max. 40m

i

12mm max. 80m