9. Receipt and storage
The PMA100 is completely pre-installed and normally de-
livered in one packaging unit.
• Please take the analyser and possible special acces-
sories carefully out of the packaging material immediate-
ly after arrival, and compare the goods with the items
listed on the delivery note;
• Check the goods for any damage caused during delivery
and, if necessary, notify your transport insurance com-
pany without delay of any damage discovered.
Note!
The oxygen analyser PMA100 must be stored in a whea-
ther-protected frost-free area!
10.Installation
The PMA100 is built in a 19“ housing, which is also suitable
for table mounting.
Accurate and proper installation of the PMA100 analyser
will not only minimize instrument breakdown, but it will also
result in reliable operation of the analyser.
The operator must be satisfied that the analyser installation
and positioning is safe for extremes of conditions which
could occur in the operating environment of the analyser.
Choose installation sites which are reasonable free from
vibration sources, and are not subjected to large tempera-
ture fluctuations outside the analyser specifications.
Without any precautions avoid any back pressure different
from barometric pressure at the gas outlet of the analyser.
Note that the PMA100 analyser is only suitable for
measuring of non-hazardous gas mixtures in non-hazar-
dous areas!
11.Starting up
Before using the equipment for the first time, check that the
safety measures specific to the installation and process are
complied with.
Before connecting the analyser to the mains, compare
the mains voltage with the information on the type plate
of the analyser.
Note!
The working temperature of the analyser is 55
°
C. After
starting, the analyser warms up. The current temperature is
displayed.
During the warm-up time the menu of the analyser is locked
for use.