10. Connect the power cable and the appropriate data cable (SCSI) from the system board or SCSI controller

to the device.

11. The air flow guide, the fan assembly, and the fan cage may need to be removed to access the back of the

drive cage to connect the drive data and power cables.

12. Replace the cover(s) and front bezel.

13. If the Server is rack mounted, slide it back into the rack and secure it.

14. Return power to the Server and run the Setup Utility to configure the device.

Selecting SCSI Tape Drives

Table 3-2

lists the supported tape drive models with their respective part number, size (half height or full

height), and the Hp Server location in which the tapes are supported.

Figure 3-12

displays linear drawings of

the HP Server tc4100 rack and pedestal versions with the locations for the different SCSI Tape Drive models.
Use

Figure 3-12

to match the codes on the “Supported Location” column of

Table 3-2

.

NOTE

Tape drives do not come with the mounting hardware that is required for installation. Be
sure to order the appropriate mounting kit (HP product number Q1447A).

Table 3-2. SCSI Tape Drives Specification

DRIVE

Size

Part No.

Supported Location

Comments

DLTVS 80i

Half Height C7405A

R1 or R2, P2 or P3

Use the plastic drive rails
when installing.

DAT 40i

Half Height C56864A

R1 or R2, P2 or P3

Use the plastic drive rails
when installing.

Ultrium 215i

Half Height C7420A

R1 or R2, P2 or P3

Use the metal drive rails
when installing on the server.

DAT 24i

Half Height C1555D

R1 or R2, P2 or P3

Use the metal drive rails
when installing on the server.

DAT 24x6i

Full Height

C5677B

R1 and R2, P2 and P3
(Two HH slots are required)

Use the metal drive rails
when installing on the server.

Ultrium 230i

Full Height

C7400A

R1 and R2, P2 and P3
(Two HH slots are required)

If this drive is installed in
position P2 or P3, it is
necessary to remove the
power protection bracket of
the server.
Drive will extend slightly
from the front of the server.
Use the metal drive rails
when installing on the server.

DAT 40x6i

Full Height

C5677A

R1 and R2, P2 and P3
(Two HH slots are required)

If this drive is installed in
position P2 or P3, it is
necessary to remove the
power protection bracket of
the server.
Use the metal drive rails
when installing on the server.