Connecting power to the unit, Installing the prosoft software – ProSoft Technology PLX81-EIP-61850 User Manual
Page 13

PLX8x-EIP-61850 ♦ Communication Gateway
Start Here
Server to
IEC 61850 Client
User Manual
ProSoft Technology, Inc.
Page 13 of 167
July 2, 2015
To mount the ProLinx IEC 61850 Series gateway module on a DIN-rail, follow
these steps.
1 Position the gateway module on the DIN-rail B at a slight angle.
2 Hook the lip on the rear of the adapter onto the top of the DIN-rail, and rotate
the adapter onto the rail.
3 Press the adapter down onto the DIN-rail until flush. The locking tab snaps
into position and lock the module to the DIN-rail.
4 If the adapter does not lock in place, use a screwdriver or similar device to
move the locking tab down while pressing the adapter flush onto the DIN-rail
and release the locking tab to lock the adapter in place. If necessary, push up
on the locking tab to lock.
1.6
Connecting Power to the Unit
WARNING: Be sure not to reverse polarity when applying power to the gateway.
This causes
permanent damage to the gateway’s internal power distribution
circuits.