8.5.3 Grid parameters
Parameter
Unit
Range
Description
Factory settings
Rated Grid Voltage
V
208 ... 400
Rated value of the grid voltage
Device-specific
Rated Grid
Frequency
Hz
50 ... 60
Rated value of the grid frequency
60
Grid Over Voltage
Level 1
%
105 ... 125
Upper limit expressed as a percen-
tage of the rated grid voltage for grid
overvoltage level 1
110
Grid Under Voltage
Level 1
%
75 ... 110
Lower limit expressed as a percen-
tage of the rated grid voltage for grid
under voltage Level 1
90
Grid Over Fre-
quency Level 1
Hz
0.0 ... 3.0
Upper limit for grid over frequency
level 1
0.2
Grid Under
Frequency Level 1
Hz
0.0 ... 3.0
Lower limit for grid under frequency
level 1
2
Frequency
Dependant Power
Reduction Enable
–
On(1), Off(0)
“On” means that the frequency-
dependant power reduction is wor-
king
0
Power Gradient
Enable
–
On(1), Off(0)
“On” means tat the power gradient is
working
1
Power Gradient
Ramp
s
0.0 ... 600
Time for power gradient ramp
The inverter must generate the active
power slowly with specific slope
when its operation stops. In this case,
the active power supply cannot be
>10 % of the rated active power per
minute.
600
Time shift
s
0.0 ... 6000
Delay time for inverter start
0
Gate-way Enable
–
0.0 ... 1.0
Reserved parameter
0
Grid Level 2
Protection Enable
–
On(1), Off(0)
“On” means that grid level 2 protec-
tion is working
1
Grid Over Voltage
Level 2
%
105 ... 130
Upper limit expressed as a percen-
tage of the rated grid voltage for grid
overvoltage level 2
120
Grid Under Voltage
Level 2
%
75 ... 100
Lower limit expressed as a percen-
tage of the rated grid voltage for grid
under voltage Level 2
80
Grid Under
Frequency Level 2
Hz
0.0 ... 3.0
Lower limit for grid under frequency
level 2
2.5
Grid Over Voltage
Level 1 Trip time
ms
1000 ... 10000
Time for grid over voltage level 1 trip
5000
Grid Over Voltage
Level 2 Trip time
ms
40 ... 2000
Time for grid over voltage level 2 trip
100
Grid Under Voltage
Level 1 Trip time
ms
1000 ... 10000
Time for grid under voltage level 1
trip
5000