SMA Solar Technology AG

7  Commissioning

Installation Manual

STP8-17TL-IA-en-31

59

9. Plug the Electronic Solar Switch in firmly right up to

the stop.

10. Switch on the miniature circuit-breaker.
11. If a multi-function relay is connected, switch on the supply voltage.
12. Check whether the display and LEDs are indicating a normal operating state.

☑ If the inverter has been commissioned successfully, the green LED should be on or flashing,

provided there is sufficient solar irradiation.
The significance of a glowing red LED and of the event numbers on the display is described in
Section 11.2.

LED

Colour

Meaning

A

Green

Glowing: operation
Flashing: waiting for
sufficient irradiation

B

Red

Disturbance

C

Blue

Bluetooth communication is
active