Figure 16: Pin assignment for the pin groups Analog current input 1, Analog current input 2 and Analog
current input 3

Pin group

Pin

Signal

Explanation

Analog current input 1

A1

Not assigned

Reserved for future applications

A2

I+

Current input

A3

I−

Current return

A4

GND

Shield ground

Analog current input 2

A5

Not assigned

Reserved for future applications

A6

I+

Current input

A7

I−

Current return

A8

GND

Shield ground

Analog current input 3

B1

Not assigned

Reserved for future applications

B2

I+

Current input

B3

I−

Current return

B4

GND

Shield ground

Procedure:

1. Connect the connection cable to the sensor (see the manual from manufacturer). Trim the

unneeded insulated conductors up to the cable shield and note down the conductor colors.

2. For connection to the pin group Analog current input 1, perform the following steps:

• Unlock conductor entry 4 with a screwdriver and insert the insulated conductor of the

wire into the conductor entry.

• Unlock conductor entries 2 and 3 with a screwdriver and insert the insulated conductors

of the connection cable into the conductor entries. Observe the pin assignment.

• Insert the eight-pole plug into pin row A in terminal X8.

3. For connection to the pin group Analog current input 2, perform the following steps:

6 Connection and Commissioning

SMA Solar Technology AG / SMA America, LLC

Installation Manual

ClusterController-IA-en-14

50