Figure 15: Pin assignment for pin group Analog current input 1

Pin

Signal

Explanation

A1

Not assigned

Reserved for future applications

A2

I+

Current input

A3

I−

Current return

A4

GND

Shield ground

Procedure:

1. Connect the connection cable to the irradiation sensor (see the manual from manufacturer).

Trim the unneeded insulated conductors up to the cable shield and note down the conductor
colors.

2. Connect the connection cable to the eight-pole plug:

• Unlock conductor entry 4 with a screwdriver and insert the insulated conductor of the

wire into the conductor entry.

• Unlock conductor entries 2 and 3 with a screwdriver and insert the insulated conductors

of the connection cable into the conductor entries. Observe the pin assignment.

3. Insert the eight-pole plug into pin row A in terminal X8.
4. On the connection cable, mark the terminal and the pin row to which the connection cable is

assigned. Use the supplied cable tie with caption field.

5. Write down the terminal assignment on the supplied supplementary sheet.
6. Adjust the characteristic curve of the irradiation sensor or pyranometer via the

Cluster Controller user interface (see the Cluster Controller user manual). The measured
irradiation values can then be shown on the display and the Cluster Controller user interface.

6 Connection and Commissioning

SMA Solar Technology AG / SMA America, LLC

Installation Manual

ClusterController-IA-en-14

48