3 cycles for drilling, tapping and thread milling, Overview – HEIDENHAIN iTNC 530 (340 49x-02) ISO programming User Manual
Page 272

272
8 Programming: Cycles
8.3 Cy
cles f
o
r Dr
illing, T
a
pping and Thr
ead Milling
8.3 Cycles for Drilling, Tapping and
Thread Milling
Overview
The TNC offers 16 cycles for all types of drilling operations:
Cycle
Soft key
Page
G240 CENTERING
With automatic pre-positioning, 2nd set-
up clearance, optional entry of the
centering diameter or centering depth
G200 DRILLING
With automatic pre-positioning, 2nd set-
up clearance
G201 REAMING
With automatic pre-positioning, 2nd set-
up clearance
G202 BORING
With automatic pre-positioning, 2nd set-
up clearance
G203 UNIVERSAL DRILLING
With automatic pre-positioning, 2nd set-
up clearance, chip breaking, and
decrementing
G204 BACK BORING
With automatic pre-positioning, 2nd set-
up clearance
G205 UNIVERSAL PECKING
With automatic pre-positioning, 2nd set-
up clearance, chip breaking, and
advanced stop distance
G208 BORE MILLING
With automatic pre-positioning, 2nd set-
up clearance
G206 TAPPING NEW
With a floating tap holder, with automatic
pre-positioning, 2nd set-up clearance
G207 RIGID TAPPING NEW
Without a floating tap holder, with
automatic pre-positioning, 2nd set-up
clearance
G209 TAPPING W/ CHIP BRKG
Without a floating tap holder, with
automatic pre-positioning, 2nd set-up
clearance, chip breaking