beautypg.com

3 cycles for drilling, tapping and thread milling, Overview – HEIDENHAIN iTNC 530 (340 49x-02) ISO programming User Manual

Page 272

background image

272

8 Programming: Cycles

8.3 Cy

cles f

o

r Dr

illing, T

a

pping and Thr

ead Milling

8.3 Cycles for Drilling, Tapping and

Thread Milling

Overview

The TNC offers 16 cycles for all types of drilling operations:

Cycle

Soft key

Page

G240 CENTERING
With automatic pre-positioning, 2nd set-
up clearance, optional entry of the
centering diameter or centering depth

Page 274

G200 DRILLING
With automatic pre-positioning, 2nd set-
up clearance

Page 276

G201 REAMING
With automatic pre-positioning, 2nd set-
up clearance

Page 278

G202 BORING
With automatic pre-positioning, 2nd set-
up clearance

Page 280

G203 UNIVERSAL DRILLING
With automatic pre-positioning, 2nd set-
up clearance, chip breaking, and
decrementing

Page 282

G204 BACK BORING
With automatic pre-positioning, 2nd set-
up clearance

Page 284

G205 UNIVERSAL PECKING
With automatic pre-positioning, 2nd set-
up clearance, chip breaking, and
advanced stop distance

Page 287

G208 BORE MILLING
With automatic pre-positioning, 2nd set-
up clearance

Page 290

G206 TAPPING NEW
With a floating tap holder, with automatic
pre-positioning, 2nd set-up clearance

Page 292

G207 RIGID TAPPING NEW
Without a floating tap holder, with
automatic pre-positioning, 2nd set-up
clearance

Page 294

G209 TAPPING W/ CHIP BRKG
Without a floating tap holder, with
automatic pre-positioning, 2nd set-up
clearance, chip breaking

Page 296