Network requirements – H3C Technologies H3C S5560 Series Switches User Manual
Page 359

343
Destination: 120::/64 Protocol : Static
NextHop : 10::100 Preference: 65
Interface : Vlan11 Cost : 0
Static Routing table Status : < Inactive>
Summary Count : 0
The output shows that Switch A communicates with Switch B through VLAN-interface 11.
BFD for IPv6 static routes configuration example (indirect next
hop)
Network requirements
As shown in
:
•
Switch A has a route to interface Loopback 1 (2::9/128) on Switch B, and the output interface is
VLAN-interface 10.
•
Switch B has a route to interface Loopback 1 (1::9/128) on Switch A, and the output interface is
VLAN-interface 12.
•
Switch D has a route to 1::9/128, and the output interface is VLAN-interface 10. It also has a route
to 2::9/128, and the output interface is VLAN-interface 12.
Configure the following:
•
Configure an IPv6 static route to subnet 120::/64 on Switch A.
•
Configure an IPv6 static route to subnet 121::/64 on Switch B.
•
Enable BFD for both routes.
•
Configure an IPv6 static route to subnet 120::/64 and an IPv6 static route to subnet 121::/64 on
both Switch C and Switch D.
When the link between Switch A and Switch B through Switch D fails, BFD can detect the failure
immediately and Switch A and Switch B can communicate through Switch C.
Figure 84 Network diagram
Table 20 Interface and IP address assignment
Device Interface
IPv6 address
Switch A
Vlan-int10
12::1/64
Switch A
Switch B
Switch C
BFD
Vlan-int10
Vl
an
-int11
Vlan-int11
Vlan-int13
Vl
an
-int13
Vlan-int10
121::/64
120::/64
Switch D
Vlan-int12
Vlan-int12
Loop1
1::9/128
Loop1
2::9/128