A. 5 - 25 watt installation, Unpacking and inspection, Personnel – Comtech EF Data XSAT-7080 User Manual
Page 83: Tools required, Appendix a. 5 – 25 watt installation, A.1 u, A.2 p, A.3 t

A–1
Appendix A. 5 – 25 WATT
INSTALLATION
A.1 U
NPACKING AND
I
NSPECTION
Inspect the shipping container for damage:
Step
Procedures
1
Retain shipping container and packing materials for possible re-shipment.
2
Checked to determine that all parts, materials and documentation has been
shipped with the converter.
3
Inspect converter for possible damage, and then tested for proper operation.
4
Notify the Comtech EF Data Customer Service representative immediately;
if the shipment is incomplete, or there is mechanical damage, or the
converter does not operate properly:
5
Notify the carrier, and retain all shipping materials for inspection by the
carrier; if there is damage to the shipping container:
A.2 P
ERSONNEL
Comtech EF Data recommends that two technicians be required to install any of the
following
installations.
A.3 T
OOLS
R
EQUIRED
The following tools are recommended for unit installation.
Qty. Description
1
1
1
Adjustable Wrench
Alternate: Set of various box wrenches
Phillips
- Head Screwdriver
Tin Snips