Lna installation – Comtech EF Data XSAT-7080 User Manual

Page 104

background image

XSAT7080 X-Band Transceiver

Revision 0

5-25W Installation

MN/XSAT7080.IOM

A–22

A.5.5 LNA I

NSTALLATION





Figure A-21. Switch Port Locations







Step

Procedures

1

Remove all protective tape from switch and keep it clean.

2

Position Low Noise Amplifiers (LNAs) and gasket (4, Figure A-22) on Port 2
and Port 4 of switch (11).

3

Secure each LNA with eight bolts (8), lock washers (6) and flat washers (5).

4

Position waveguide termination (3) and gasket (4) on Port 3 and secure with
eight bolts (8), lock washers (6), and flat washers (5).

5

Position filter (10), gasket (4) and use eight bolts (8), lockwashers (6), and flat
washers (5) on remaining port.