beautypg.com

1 ac system startup procedure – Artesyn Centellis 2000 Shelf Release 3.0 Installation and Use (May 2014) User Manual

Page 91

background image

System Installation

Centellis 2000 Shelf Release 3.0 Installation and Use (6806800L99G)

91

The following sections describes the startup procedure for Centellis 2000 AC and Centellis
2000 DC systems.

3.3.3.1

AC System Startup Procedure

Depending on the system configuration, the actual powering up may take up to 3 minutes.

Make sure that the system has been placed in a location at room temperature for at least
24 hours before powering it up.

1. Put on an ESD wrist strap.

2. Connect the strap to the shelf by attaching the front or rear ESD jack/ESD snap.

3. Mount the grounding cable to the Protective Earth connection lug if not done

already.

4. Make sure that the external power feeds you plan to attach are powered off and

cannot be switched on while you are working.

5. Connect the AC International Electric Code (IEC) wired connector to the AC power

supplies.

Product Damage
Improper cabling damages your product.
Take extreme care not to connect the power cable in reverse polarity.