Site Preparation

Centellis 2000 Shelf Release 3.0 Installation and Use (6806800L99G)

73

8. Tighten loose screws before proceeding.

9. Remove the desiccant bags delivered together with the system and dispose of

them according to your country’s legislation.

2.2.2

Site and Installation Planning

Planning basic site and installation requirements you have to consider the following:

Adequate power should be available for the Centellis 2000 system

For AC, the system should be positioned in a way that 100 VAC to 240 VAC power source is
easy to reach

For DC, the system should be positioned in a way that -48 VDC to -60 VDC power source is
easy to reach

There should be sufficient space in racks to install the system

Suitable equipment should be available to lift the system into the rack

There should be enough space to run a system console terminal (only if you want to use a
local terminal). The cable should be long enough to reach the system.

There should be a inlet and outlet of the fans and therefore the airflow is not blocked

For Installation in restricted access location

For use by trained personnel

2.3

Requirements

Before and during system installation and operation, you always have to ensure that the
requirements listed in the following sections are met.

The Centellis 2000 is thoroughly inspected before shipment. If any damage occurred during
transportation or any items are missing, please contact our customer's service immediately.